Level Crossing Removal Project

St Albans, Melbourne – Furlong Road and Main Road.

Project Overview

The project included the removal of the Main Road and Furlong Road level crossings. The design and construction work included:

  • Lowering the rail lines below Main Road and Furlong Road
  • Rebuilding St Albans and Ginnifer Stations
  • Accessing lowered platforms via lifts, ramps and stairs
  • Reconstructing the station car parks
  • Pedestrian overpasses.

Project Outcomes

Core Consultants geotechnical team was engaged under our partnering agreement with Golder Associates to carry out geotechnical surveillance activities during the construction phase of the project.

The geotechnical surveillance activities included appraisal and assessment of various groundworks including:

  • Soil Nail Walls
  • Soldier Pile Walls
  • High Level Strip and Pad Footings
  • Bored Piles
  • Crane and Piling Rig Working Platform
  • Subgrade Evaluation and Proof Rolls.

Additional information regarding this project can be found at the Level Crossing Removal Project Furlong Main website, with several time lapse and drone videos available.

Head Office
PO Box 5569
Maroochydore BC Qld 4558
07 5475 5900

ACN: 603 384 050

Sunshine Coast
55 Kingsford Smith Parade
Maroochydore Qld 4558

Brisbane
Level 54, 111 Eagle Street
Brisbane Qld 4000
07 3012 6548

Gold Coast
36 Kuranga Avenue
Southport Qld 4215
07 5503 1943

Pin It on Pinterest

Subscribe to our enewsletter

Join our mailing list to receive the latest news and updates from our team.

You have Successfully Subscribed!